Huludao Baimashi Town Power Supply Station Multi Energy Supply Project

Internal office area wall heating and heating of the power supply station building in Baimashi Town, Huludao

New clean heating for office buildings
Operating cost: 0.8 kWh/m ² · day

The clean heating transformation and upgrading of the power supply station in Baimashi Town, Huludao City, Liaoning Province, involves the upgrading and renovation of the existing three story office building and two single story buildings, with a total construction area of approximately 482.92 meters.

The project is a multi energy supply project for the power supply station in Baigaotai Town, Huludao. The electric heating equipment and distribution box are installed indoors in the existing building, with a total construction area of approximately 814.09m ². The office building of Gaotai Town Power Supply Station is a three story building, while the canteen and warehouse are single story buildings located within the campus; The small canteen and the electricity sales hall are located in another courtyard, with separate power sources connected.

Share